Here is what I will be doing when I get home from work today.
Getting some preliminary things done 1st.
Done already:
1.  I cut the plywood in half:
 
2.  I then drilled a 2" hole and a 1/2" hole on the CG frame, and made sure it fits on the fuselage side:
 
one will be on each side.
then
3.  I mark the 3.5" balance point. 
 
from here, I removed it, and also made a square line to the top of the fuselage. 
4.  I began to mark out the different balance points that are possible, my goal being 3.5"
  
SO, once I get home, I will drill out these holes on top, for the pulley hanging system, and then put everything together, wings and canopy, batteries, no fuel, and see where she balances.
then, I will begin to cut out from the rear underbelly, til we get some balance point moving forward to the CG point.